bg_image

Payo Selincah, Jambi

Collaboration between TCM and PT Energasindo Heksa Karya in the operation and maintenance of gas pipelines and distribution located in Payo Selincah, Jambi. The distributed gas supply will be used by PLN for power generation, namely PLTG Payo Selincah.

Details :

  • Pipe Length : 35.5 KM
  • Pipe Diameter : 12 Inches
  • Capacity : 60 MMSCFD
  • Pipe Location : Payo Selincah, Jambi

img
img

Sei Gelam, Jambi

Collaboration between TCM and PT Energasindo Heksa Karya, which is a continuation of the Payo Selincah pipeline that flows to PLN's power plant, namely PLTG Sei Gelam.

Details :

  • Pipe Length : 12 KM
  • Pipe Diameter : 8 Inches
  • Capacity : 32.7 MMSCFD
  • Pipe Location : Sei Gelam, Jambi

Rokan, Riau

TCM in collaboration with TIP, performs business activities supporting the operation and maintenance of crude oil facilities, provision of Light Passenger Vehicles, electrical work, and civil construction in fulfillment of TIP’s contract with PT Pertamina Gas in the Rokan area, Riau. This contract is a joint effort to support the government’s program to increase lifting from the Rokan block, which is the backbone (one third) of the national oil production.

The Rokan oil pipeline was built in two corridors, namely the Balam-Bangko-Dumai and Minas-Duri-Dumai corridors. This pipeline passes through five regencies/cities in Riau Province, namely Dumai, Bengkalis, Siak, Kampar and Rokan Hilir.

Details :

  • Pipe Length : 367 KM
  • Pipe Diameter : 4-24 Inches
  • Pipe Corridor : 2 Corridors
  • Capacity : 160.000 barrel/day
  • Pipe Location : Dumai, Bengkalis, Siak, Kampar and Rokan Hilir

img
img

Cilegon, Banten

Collaboration between TCM and TIP, in the operation and maintenance of a gas compressor with an installed capacity of 51+15 MMSCFD to serve a 4x15 MMSCFD contract located at PLTGU Cilegon, Banten. The gas produced is used for a Gas and Steam Power Plant (PLTGU), which in turn supplies electricity to the Java-Bali electricity system via a 150kV transmission network.

Details :

  • Facilities : 4 units Gas Compressor
  • Capacity : 51+15 MMSCFD
  • Gas Pressure Level : 135 – 630 psi
  • Pipe Location : PLTGU Cilegon, Banten

Tegal Gede, Bekasi, Jawa Barat

Collaboration between TCM and TIP, in the operation and maintenance of a 35 Km gas pipelines network, located in Tegal Gede, Bekasi.

Details :

  • Pipe Length : 35 Km
  • Pipe Diameter : 8 inches
  • Maximum Capacity : 18 MMSCFD
  • Pipe Location : Tegal Gede, Bekasi

img
img

Gresik, Jawa Timur

Collaboration between TCM and PT Petrogas Jatim Utama in the operation and maintenance of gas and distribution pipelines located in Gresik, East Java, for distribution to PT PJB UP Gresik's customers.

Details :

  • Pipe Length : 20 Km
  • Pipe Diameter : 16 inches
  • Maximum Capacity : 100 MMSCFD
  • Pipe Location : Gresik, East Java