8 November 2026 · 26th Anniversary of PT Trimitra Cipta Mandiri — Twenty-six years safeguarding the reliability of Indonesia’s energy
ID EN
Home  /  Proyek

Projects We Have Delivered

Empat Belas contracts recorded with geothermal, oil and gas, and power generation operators across Indonesia — from Jambi and Riau to Gunung Salak and Wayang Windu.

14Recorded projects
8Active contracts
17Years, longest contract
5Operating areas
Featured Projects

Three Major Contracts Running Now

Ongoing projects with the broadest scope and the largest teams in the field.

Operation & Maintenance Support Services — SalakGEOTHERMAL

Operation & Maintenance Support Services — Salak

Star Energy Geothermal Salak, Ltd. & Salak Pratama, Ltd.

Full operation and maintenance support for one of the world’s largest geothermal fields. TCM places a multidisciplinary team on site to keep the steam production and power generation facilities reliable throughout the three-year contract.

  • Mechanical, electrical & instrumentation, rotating equipment, and civil
  • Scaffolding, welding, machining, and heavy equipment & lifting
  • Material planning & coordination, asset management, SAP and logistics
  • SHE support: emergency response and daily safety supervision
Location:: Gunung Salak, SukabumiPeriod: Dec 2024 – Nov 2027Status:: Ongoing
Drilling Preparation & Well Hook-Up ConstructionCONSTRUCTION

Drilling Preparation & Well Hook-Up Construction

Star Energy Geothermal (Wayang Windu) Limited

Integrated construction work to prepare the drilling site and connect new wells to the production network — from bare land to a system ready for commissioning.

  • Land clearing, access road construction, and foundation works
  • Pipe, valve, and equipment installation; welding and insulation
  • Instrumentation system and electrical cable installation
  • ITP documentation and as-built drawings through to handover
Location:: Wayang Windu, West BandungPeriod: Nov 2025 – Nov 2027Status:: Ongoing
Rokan Block Operations SupportOIL & GAS

Rokan Block Operations Support

PT Triguna Internusa Pratama

Provision of manpower and a light passenger vehicle fleet, together with construction of support facilities, at Indonesia’s largest oil production block.

  • Provision of operational personnel, including drivers and dispatchers
  • Provision and maintenance of the light passenger vehicle fleet
  • Civil works and operation & maintenance support facilities
  • Field coordination and compliance with OHS standards per specification
Location:: Rokan Block, RiauPeriod: Dec 2025 – Dec 2028Status:: Ongoing
Oil & Natural Gas

A Long Track Record in Jambi

Since 2009 TCM has operated and maintained the natural gas transmission facilities of PT Energasindo Heksa Karya in Jambi Province — delivering gas to PT PLN (Persero) power plants. Two pipeline sections totalling 47.5 km have been kept reliable without interruption for seventeen years, forming the foundation of TCM’s oil and gas competence.

17years in operation
47.5 kmtotal pipeline
92.7MMSCFD capacity
Gas metering station operated by TCM in Jambi Province.
Gas metering station operated by TCM in Jambi Province.
Tempino Kecil Payo Selincah Sei Gelam Muaro Jambi PT PLN (Persero) power plant Sei Gelam power plant 35.5 km · 12″ · 60 MMSCFD 12 km · 8″ · 32.7 MMSCFD
Payo Selincah, Jambi

Payo Selincah, Jambi

PT Energasindo Heksa Karya
Length35.5 km
Diameter12 inch
Capacity60 MMSCFD
Period2009–2025

Operation and maintenance of the natural gas transmission line from Tempino Kecil to the PT PLN (Persero) power plant in Payo Selincah. Scope covers gas delivery operations, metering and reporting, routine maintenance of the pipeline and metering facilities, emergency response, and HSE management — TCM’s longest-running contract.

Sei Gelam, Jambi

Sei Gelam, Jambi

PT Energasindo Heksa Karya
Length12 km
Diameter8 inch
Capacity32.7 MMSCFD
Period2016–2025

A continuation of the Payo Selincah line, flowing gas to PT PLN (Persero)’s Sei Gelam power plant. Scope includes operating the gas delivery system, metering and monitoring, maintenance of the pipeline and measurement facilities, provision of manpower and equipment, and daily to monthly operational reporting.

Full List

Empat Belas Proyek

Click any row to open the contracted scope of work in detail. Use the filters below to view projects by field.

Operation & Maintenance Support Services (OMSS) — Salak

Klien: Star Energy Geothermal Salak, Ltd. & Star Energy Geothermal Salak Pratama, Ltd. Lokasi: Area Gunung Salak, Sukabumi — Jawa Barat Periode: Des 2024 – Nov 2027
ONGOING
Lingkup Pekerjaan

Penyediaan tenaga kerja, peralatan, dan jasa teknis untuk mendukung kegiatan operasi dan pemeliharaan fasilitas panas bumi: mechanical, electrical & instrumentation, rotating equipment, civil, scaffolding, welding, machining, serta heavy equipment & lifting. Termasuk perencanaan dan koordinasi material, dukungan SHE (emergency response & safety), asset management (reservoir & geoscience), dan support services (administrasi, SAP, logistik). Lingkup mencakup jasa rutin — operasi, pemeliharaan, inspeksi, dan dukungan harian — serta jasa non-rutin berdasarkan Work Order atau instruksi Perusahaan sepanjang masa kontrak.

MechanicalElectrical & InstrumentRotating EquipmentCivilScaffoldingWelding & MachiningHeavy Equipment & LiftingSHE SupportSAP & Logistik

Operation & Maintenance Support Services (OMSS) — Wayang Windu

Klien: PT Triguna Internusa Pratama Lokasi: Area Operasi Panas Bumi Wayang Windu — Kabupaten Bandung Barat Periode: Mar 2024 – Des 2026
ONGOING
Lingkup Pekerjaan

Penyediaan tenaga kerja, peralatan, dan jasa teknis untuk kegiatan operasi dan pemeliharaan fasilitas panas bumi Wayang Windu, meliputi pekerjaan mechanical, electrical, instrumentation, rotating equipment, civil, scaffolding, welding, machining, serta heavy equipment & lifting. Termasuk perencanaan dan koordinasi material, dukungan SHE, asset management, dan support services seperti administrasi, SAP, dan logistik — untuk pekerjaan rutin maupun non-rutin berdasarkan Work Order.

MechanicalElectrical & InstrumentCivilScaffoldingWeldingAsset Management

Drilling Preparation & Well Hook-Up Construction

Klien: Star Energy Geothermal (Wayang Windu) Limited Lokasi: Area Operasi Panas Bumi Wayang Windu — Kabupaten Bandung Barat Periode: Nov 2025 – Nov 2027
ONGOING
Lingkup Pekerjaan

Penyediaan tenaga kerja, peralatan konstruksi, material, serta jasa engineering dan manajemen proyek untuk pekerjaan sipil, mekanikal dan perpipaan, serta elektrikal dan instrumentasi. Kegiatan mencakup land clearing, pembangunan akses dan pondasi, instalasi pipa, valve, dan peralatan, pekerjaan welding dan insulation, instalasi sistem instrumentasi dan kabel, serta dukungan pekerjaan umum seperti scaffolding, heavy equipment, dan dokumentasi (ITP dan as-built drawing) — dari tahap persiapan, konstruksi, hingga commissioning dan serah terima sesuai gambar dan spesifikasi yang berlaku.

Land ClearingPondasi & AksesPiping & ValveWeldingInsulationInstrumentasi & KabelCommissioningAs-Built Drawing

Repair Awi 13 AFT, Additional Inlet Valve Scrubber & Condensate Line Replacement

Klien: Star Energy Geothermal Salak, Ltd. Lokasi: Area Gunung Salak, Sukabumi — Jawa Barat Periode: Jan 2025 – Jan 2027
ONGOING
Lingkup Pekerjaan

Penggantian Awi 13 AFT, pemasangan additional inlet valve pada steam scrubber, dan penggantian jalur kondensat. Lingkup mencakup penyediaan tenaga kerja, peralatan, material pendukung, serta jasa konstruksi untuk pembongkaran, fabrikasi, perbaikan pondasi, penggantian anchor bolt, erection, penyambungan kembali perpipaan, pengecatan, dan pekerjaan finishing — termasuk survei dan mobilisasi-demobilisasi, dilaksanakan sesuai standar perusahaan dan kode internasional yang berlaku.

FabrikasiErectionPerbaikan PondasiAnchor BoltPipingPainting

Binary ORC — Heat Exchanger Cleaning Maintenance Services

Klien: Star Energy Geothermal Salak Pratama, Ltd. Lokasi: Area Gunung Salak, Sukabumi — Jawa Barat Periode: Agu 2025 – Agu 2028
ONGOING
Lingkup Pekerjaan

Pembersihan tube pada peralatan preheater dan vaporizer sistem ORC menggunakan metode high pressure water jet, dilaksanakan dalam kondisi shutdown dengan memperhatikan standar keselamatan kerja di area berbahaya (hazardous area). Termasuk penyediaan tenaga kerja, peralatan, pengawasan keselamatan, pengelolaan limbah, koordinasi pekerjaan, pelaporan, serta pemenuhan seluruh ketentuan HSE yang berlaku.

High Pressure Water JetPreheater & VaporizerHazardous AreaWaste ManagementHSE Compliance

Diesel Engine Maintenance Services

Klien: Star Energy Geothermal Salak, Ltd. Lokasi: Area Gunung Salak, Sukabumi — Jawa Barat Periode: Okt 2025 – Okt 2028
ONGOING
Lingkup Pekerjaan

Penyediaan tenaga kerja, peralatan, dan jasa teknis untuk pemeliharaan preventif berkala, inspeksi, analisa teknis (termasuk analisa minyak pelumas), perbaikan, dan major overhaul mesin diesel, serta penyediaan suku cadang sesuai kebutuhan. Dilaksanakan secara rutin (Preventive Maintenance) maupun berdasarkan permintaan (on-call) untuk kondisi abnormal atau darurat, termasuk troubleshooting dan minor repair sepanjang periode kontrak.

Preventive MaintenanceOil AnalysisMajor OverhaulOn-Call ServiceTroubleshooting

Road Repair and Maintenance — Cikidang – Ciawitali

Klien: Star Energy Geothermal Salak, Ltd. Lokasi: Sukabumi — Jawa Barat Periode: Okt 2025 – Okt 2026
ONGOING
Lingkup Pekerjaan

Penyediaan tenaga kerja, material, dan peralatan untuk perbaikan jalan dan bahu jalan di area operasi dan sekitarnya, meliputi perbaikan subbase, pelapisan aspal (overlay), pekerjaan beton, perbaikan drainase, dan pemasangan gabion. Termasuk mobilisasi-demobilisasi, pengujian mutu (QA/QC), dan penyusunan laporan pekerjaan sesuai spesifikasi teknis yang ditetapkan Perusahaan.

SubbaseAsphalt OverlayPekerjaan BetonDrainaseGabionQA/QC

Penyediaan Tenaga Kerja & Kendaraan Ringan Penumpang — Area Rokan

Klien: PT Triguna Internusa Pratama Lokasi: Area Rokan — Riau Periode: Des 2025 – Des 2028
ONGOING
Lingkup Pekerjaan

Penyediaan personel untuk mendukung kegiatan operasional Perusahaan — termasuk namun tidak terbatas pada posisi driver dan dispatcher — serta penyediaan unit kendaraan ringan penumpang yang siap digunakan. Lingkup juga meliputi pemeliharaan dan penjagaan kondisi kendaraan serta pemenuhan standar keselamatan dan ketentuan yang berlaku guna memastikan kelancaran operasional.

Manpower SupplyDriver & DispatcherFleet ManagementPerawatan KendaraanStandar Keselamatan

Shut Down Turn Around (SDTA) Unit 400, 500 & 600

Klien: Star Energy Geothermal Salak Lokasi: Area Gunung Salak, Sukabumi — Jawa Barat Periode: 2025
COMPLETED
Lingkup Pekerjaan

Dukungan pekerjaan shutdown terjadwal pada Unit 400, 500, dan 600 — mencakup persiapan dan isolasi peralatan, pembongkaran dan inspeksi komponen, pekerjaan welding dan machining, perbaikan serta penggantian bagian yang aus, hingga pemasangan kembali dan pengembalian unit ke kondisi operasi, dengan pengawasan keselamatan penuh sepanjang jendela shutdown.

Isolasi PeralatanInspeksiWelding & MachiningOverhaulStart-Up Support

Jasa Konstruksi Perbaikan Cooling Tower & Fasilitas Pendukung

Klien: PT Triguna Internusa Pratama Lokasi: Area Gunung Salak, Sukabumi — Jawa Barat Periode: Des 2023 – Jul 2025
COMPLETED
Lingkup Pekerjaan

Perbaikan menara pendingin Unit 400, 500, dan 600 dalam kondisi operasi (on-line): pembongkaran dan pemasangan fill grid beserta aksesoris, perbaikan beton pada kolom, balok, louver, lantai, dinding dan tangga, pelapisan/coating, pemasangan HDPE wrapping, serta injeksi retak beton. Dilengkapi jasa pendukung berupa pekerjaan scaffolding — erection dan dismantling, penyediaan material perancah, tenaga kerja bersertifikat, dan dukungan keselamatan kerja selama pelaksanaan.

Fill GridPerbaikan BetonCoatingHDPE WrappingInjeksi RetakScaffolding

Fabrication & Install Rock Muffler — PLN Unit 1/3

Klien: PT PLN (Persero) Lokasi: Area Gunung Salak, Sukabumi — Jawa Barat Periode: 2025
COMPLETED
Lingkup Pekerjaan

Fabrikasi dan pemasangan rock muffler untuk unit pembangkit: pekerjaan fabrikasi struktur dan plat, persiapan pondasi, pengangkatan dan pemasangan di lapangan, penyambungan perpipaan, pengecatan pelindung, serta pengujian dan serah terima — dilaksanakan dengan dukungan alat berat dan pengawasan keselamatan kerja.

Fabrikasi StrukturPondasiErectionPipingCoatingHeavy Lifting

Pekerjaan Konstruksi Fasilitas Pendukung Operasi & Pemeliharaan

Klien: PT Triguna Internusa Pratama Lokasi: Area Rokan — Riau Periode: Jan 2024 – Des 2024
COMPLETED
Lingkup Pekerjaan

Pengadaan, pemasangan, dan pelaksanaan pekerjaan sipil serta fasilitas pendukung operasi dan pemeliharaan di Proyek Rokan, termasuk pemeliharaan, koordinasi lapangan, dan pemenuhan standar K3 sesuai spesifikasi yang berlaku.

Pekerjaan SipilFasilitas PendukungKoordinasi LapanganStandar K3

Jasa Pengoperasian & Pemeliharaan Fasilitas Penyalur Gas

Klien: PT Energasindo Heksa Karya Lokasi: Sei Gelam — Provinsi Jambi Periode: Agu 2016 – Des 2025
COMPLETED
Lingkup Pekerjaan

Pengoperasian dan pemeliharaan fasilitas penyalur gas berupa pipa gas bumi 8 inci sepanjang 12 km di Sei Gelam, Jambi, yang menyalurkan gas ke PLTMG PLN. Lingkup mencakup pengoperasian sistem penyaluran gas, pemantauan dan pembacaan meter, pemeliharaan rutin jalur pipa dan fasilitas pengukuran, perbaikan dan penanganan kondisi darurat, penyediaan tenaga kerja, material, dan peralatan kerja, penerapan aspek K3L, serta pelaporan operasional harian, mingguan, dan bulanan — dijalankan selama sembilan tahun melalui empat kali addendum kontrak.

Pipa Gas 8″ · 12 kmOperasi PenyaluranMeteringPemeliharaan Jalur PipaEmergency ResponseK3LPelaporan Berkala

Pengoperasian & Perawatan Sarana Penyalur Gas Bumi Tempino Kecil – Payo Selincah

Klien: PT Energasindo Heksa Karya Lokasi: Kabupaten Muaro Jambi – Kota Jambi Periode: Jan 2009 – Des 2025
COMPLETED
Lingkup Pekerjaan

Pengoperasian dan pemeliharaan sarana penyalur gas bumi berupa pipa diameter 12 inci sepanjang 35,5 km dari Tempino Kecil ke pembangkit listrik PT PLN (Persero) di Payo Selincah, Jambi. Lingkup mencakup operasi penyaluran gas, pembacaan meter dan pelaporan, pemeliharaan rutin jalur pipa dan sarana pengukuran, pengadaan material consumable, penyediaan alat keselamatan seperti APAR, perbaikan peralatan dan aset bergerak, pengelolaan aspek K3, penanganan kondisi darurat, serta laporan mingguan, bulanan, dan tahunan sesuai standar teknis industri migas — kontrak terpanjang TCM, berjalan tujuh belas tahun.

Pipa Gas 12″ · 35,5 kmOperasi PenyaluranMetering & PelaporanConsumable & APAREmergency ResponseK3
Documentation

Work in the Field

Photographs of the TCM team at work across operating areas — click to enlarge.

Passenger vehicle fleet, Rokan Block
Passenger vehicle fleet, Rokan Block
Team coordination at Rokan Block
Team coordination at Rokan Block
Drilling preparation & well hook-up
Drilling preparation & well hook-up
Shut Down Turn Around — welding
Shut Down Turn Around — welding
AFT & condensate line replacement
AFT & condensate line replacement
ORC heat exchanger cleaning
ORC heat exchanger cleaning
Rock muffler fabrication & installation
Rock muffler fabrication & installation
Road repair and maintenance
Road repair and maintenance
Welding team in the operating area
Welding team in the operating area
Valve & piping maintenance
Valve & piping maintenance
Trusted By

Our Clients & Partners

Lihat Semua Klien & Mitra →

Have Similar Work?

We are ready to support the operation, maintenance, and construction of your energy facilities with certified teams and a proven safety record.

Hubungi Kami →